2 TPH Boiler Installation — Knit Composite Mill, Gazipur
Supply, installation and commissioning of a 2 ton/hr gas-fired steam boiler including feed-water system, blowdown pit, steam header and Boiler Inspection Directorate certification. Completed in 6 weeks with zero safety incidents.
